SPECIFICATIONS
Taps™ Odor Control Manhole Inserts
scope
1. 1 Under this
item, the contractor shall supply and install to
manufacturer's recommendations a Taps™ Odor Control
Manhole Insert as shown on contract drawings and
specified hereunder.
MATERIALS & DESIGN
General
2.1 The Taps™ insert and
components shall be manufactured from corrosion proof
material suitable for atmospheres containing hydrogen
sulphide and dilute sulphuric acid as well as other
gases associated with wastewater collection systems and
be filled with dry granules capable of effective control
of odors associated with such gases.
The Body
2.2 The body shall be
made from Acrylonitrile Butadiene Styrene plastic that meets
the Federal Standards of LP 1183 and can pass the
following ASTM test requirements: D 256, D 638, D 790, D
792, D 785, D 648.
The thickness shall not be less than
3/32" nor greater than 6/32". The body shall be
manufactured to the dimensions as shown on the contract
drawings to allow easy installation in the manhole
frame.
Gasket
2.3 The gasket shall be
made of closed-cell Neoprene. The gasket shall have a
pressure sensitive adhesive on one side and be placed
under the insert rim by the manufacturer. The adhesive
shall be compatible with the body material so as to form
a long-lasting bond in either wet or dry conditions of
use.
Lift Straps
2.4 The insert shall have
two lift straps attached to its body. Lift straps shall
be made of 1” width polyester nylon and shall be seared
on all cut ends to prevent unraveling or deterioration.
Lift straps shall be attached to insert body by means of
a 3/16" stainless steel rivet.
The Insert
Granules
2.5 The granules shall
remove H
2S and malodorous compounds from the
air stream via dry-air oxidation chemistry. Oxidation
shall be accomplished via molecular contact with the
granules, producing solid by-products which are
deposited on and within the media. Other malodorous
gases shall be treated by absorption and adsorption.
Oxidation and absorptive capacities shall not be
diminished by ambient humidity.
Sizing
2.6 The insert
shall be manufactured to fit the manhole frame rim from
which it hangs. Specific field
measurements shall be required prior to
production of the insert. Instructions will be made
available to the purchaser or engineer for proper
measurements.
INSTALLATION
3.1 The manhole
frame rim shall be cleaned of all dirt or debris before
placing the insert upon the rim.
3.2 The
insert shall be fully seated around the manhole frame
rim.
FIELD TESTING & TRAINING
4.1 Measure
atmospheric H
2S in ppm after removing cover
but prior to installing insert. Measure again after
installing insert and calculate removal percentage.
4.2 No
field training required.
|